Car servicing and MOT space

Dellers Garage

The architectural design and planning permission had already been completed for this project, when Dove Construction won the build contract through the recommendation of a well respected, local commercial agent.

Dove Construction completed the design and fit out of the facility to the client's own specifications. The design of the MOT inspection pits needed assistance from Dove Construction before they were able to complete the building with these, and the necessary rolling roads.

The main building steel frame was manufactured locally and then insulated with a specialist Kingspan composite cladding to fully comply with all current building regulations.

ServicePlus

The final building is a modern, efficient vehicle servicing and MOT centre, comprising office / reception area, three servicing bays and an MOT station bay.